How to read a storm-damage roof estimate
Already have an estimate?
Check the written scope free in about a minute — no account or file upload.
What to do right now
- 1Handle hazards first: stay away from downed lines and unstable structures, and do not get on the roof yourself.
- 2Photograph all damage before any cleanup or tarping, and keep every receipt.
- 3Open your insurance claim and ask whether permanent repairs need approval before work starts.
- 4Get emergency tarping and board-up priced in writing, separately from the permanent repair.
- 5Compare at least two written permanent-repair scopes. Do not sign a contract or an assignment of benefits the day someone knocks on your door.
The rest of this page explains how to compare the written estimates once the immediate danger is handled.
9 min read
A storm-damage roof estimate is not the same document as a routine replacement quote. After a hurricane, tornado, or hailstorm you are usually juggling three things at once: an emergency repair to stop water coming in, a permanent rebuild, and an insurance claim that may pay for part of it. Each contractor estimate sits somewhere in that mix, and the vague ones cost you later. This guide walks through what a storm estimate should spell out and how to line it up against your insurance company's estimate before you sign anything. ScopeCheck compares written scopes in plain English; it does not inspect your roof, adjust your claim, or negotiate with your insurer, and neither should anyone who is not a licensed professional you chose.
Emergency work and permanent repair are two separate scopes
Tarping, board-up, shrink-wrap, tree and debris removal, and drying equipment solve an immediate safety and water problem. The permanent roof replacement is a different job with a different price. A good storm estimate prices them separately so a fast same-day authorization for a tarp does not quietly become an open-ended repair contract.
Ask for the emergency-mitigation line items on their own document or their own clearly labeled section, with their own total. Most policies cover reasonable emergency mitigation even before the full claim is settled, but only if it is documented.
The contractor estimate and the insurance estimate measure different things
Your insurance adjuster's estimate is what the carrier approved for the documented damage under your policy. The contractor's estimate is what they say it takes to build the roof to today's code. Those two numbers often differ, and the gap is usually scope, not someone being wrong.
Items the adjuster did not capture the first time - extra layers found at tear-off, code-required upgrades, steep or high access, detached structures - can legitimately come back as a supplement: a written request to the carrier to add scope with photos and measurements behind it. A storm estimate should show which line items are expected supplements rather than burying them in one lump number.
Know these five terms before you compare
RCV (replacement cost value) is what it costs to replace the roof now. ACV (actual cash value) is RCV minus depreciation for age and wear. Many carriers pay ACV first and release the recoverable depreciation after the work is done and invoiced - so the first check is not the whole job.
Your deductible comes off the top; on many Florida and Gulf Coast policies there is a separate, larger hurricane or wind deductible that is a percentage of the dwelling coverage, not a flat dollar amount. O&P (overhead and profit, often 10 and 10) may apply when multiple trades are involved. Ask the contractor to point to each of these on their estimate so the document becomes readable instead of baffling.
Code-upgrade and matching coverage
A storm rebuild has to meet current code, which can mean secondary water barrier, updated fastening, drip edge, or full deck re-nailing that the old roof never had. Whether your policy pays for that is an ordinance-or-law coverage question.
Matching is a separate question, and worth stating precisely because it is easy to over-read. In Florida, section 626.9744 puts the duty on the insurer rather than on the repair: where replaced items do not match the undamaged ones in quality, colour or size, the insurer shall make reasonable repairs or replacement of items in adjoining areas. Reasonable is doing work in that sentence - the same statute lets the carrier weigh the cost of repairing undamaged portions, how much uniformity is achievable without excessive cost, and the remaining useful life of what is already there. So it is a claim worth making with photographs and a written scope, not a guarantee that a patched slope becomes a whole new roof.
The estimate should name the code items it includes and flag which ones depend on the carrier approving ordinance-or-law or matching coverage, so you are not surprised by a change order after tear-off.
Storm-chaser red flags
Be cautious with a crew that appears door to door within days of the storm, pressures you to sign an assignment of benefits or a contingency contract on the spot, offers to waive or absorb your deductible, asks for a large deposit before any materials are ordered, or cannot give a local address and license number you can verify.
Waiving a deductible is illegal in many states, including Florida. An assignment of benefits signs your claim rights over to the contractor - it is not required to get your roof fixed, and you can decline it and still hire them.
Put the two scopes side by side
Lay the contractor estimate next to the insurance estimate and compare them line by line: roof area in squares, layers, decking, underlayment, flashing, drip edge, vents, permit, tear-off and disposal, code items, and emergency mitigation. Where they differ is exactly what to ask about - of both your contractor and your carrier.
If a contractor estimate is a single number with no line items, you cannot do this comparison, and neither can your adjuster. Ask for the itemized version before you sign.
Before signing a storm-damage roof estimate
- ✓Immediate hazards are handled and all visible damage is photographed
- ✓Emergency mitigation and permanent repair have separate prices
- ✓Roof area, layers, decking, underlayment, flashing, vents, and disposal are itemized
- ✓Expected insurance supplements are listed as line items, not hidden in a lump sum
- ✓Code-upgrade items are named, with the ones that depend on carrier approval flagged
- ✓The estimate identifies your deductible, and any separate hurricane or wind deductible
- ✓Contractor license and local address are independently verified
- ✓No request to waive the deductible and no same-day pressure to sign an AOB
- ✓Payments are tied to completed milestones, and depreciation release is explained
- ✓Material and workmanship warranties are both in writing
Free - no account - no upload
Check the quote you have
Choose the project type and answer one simple question at a time.
Free 60-second roofing quote check
Answer plain-English questions about scope, materials, permits, warranties, payment terms, and signing pressure. No account or upload required.
Check a storm repair quote freeStorm / insurance review
Compare the contractor scope with the adjuster or insurance estimate and see where the two written scopes differ, line by line.
Review the storm estimateCompare roofing estimates side by side
Use a plain-English checklist to compare roof quantities, materials, flashing, permits, cleanup, and warranties before signing.
Compare the roofing scopesPlain-English answers
Frequently asked questions
Why is my contractor's estimate higher than my insurance estimate?
Usually scope. The adjuster priced the documented damage under your policy; the contractor priced building the roof to current code. Code upgrades, extra layers found at tear-off, and access costs can legitimately be added back as supplements with photos and measurements.
What is the difference between ACV and RCV on a roof claim?
RCV is the full replacement cost. ACV is RCV minus depreciation for the roof's age and wear. Many carriers pay ACV first and release the remaining recoverable depreciation after the work is completed and invoiced.
Do I have to sign an assignment of benefits to get my roof repaired?
No. An assignment of benefits transfers your claim rights to the contractor. You can decline it and still hire that contractor. Read it carefully before signing, and never sign one under same-day pressure.
Is it legal for a roofer to waive my insurance deductible?
In many states, including Florida, it is illegal for a contractor to waive, rebate, or absorb your insurance deductible. An offer to do so is a warning sign about the rest of the deal.
Should I get emergency repairs done before the adjuster comes?
Yes, if there is active water intrusion or a safety hazard. Photograph everything first, keep the work reasonable and documented, save receipts, and keep the emergency mitigation priced separately from the permanent repair.